Tag Archives: September 13 2026 flood

Roundup: Weekend Preparedness, Flood Help, Jesup Road Bridge …

As we prepare for another weekend of wild weather — rain, wind, and who knows what else — here are some helpful links.

Connecticut Department of Emergency Services & Public Protection: click here.

State Senator Tony Hwang — who provided this information — hosted a recent Extreme Weather & Coastal Resiliency Informational Forum. It highlighted
the importance of resiliency and preparation against growing risks of flooding, severe winds, coastal erosion and extreme weather. Click here to see.

From that forum, you can link to FEMA’s Severe Wind Protection Plan (click here; page 19) and Financial Preparedness and Homeowners’ Insurance Claims (page 15).

The Connecticut Insurance Department has also launched a resource to assist with preparedness. Click here to see.

Other helpful links include:

Will this weekend bring a repeat of 2 weekends ago? Be prepared!

================================================

Meanwhile: Still cleaning up from the September 13 flood (while preparing for this weekend’s weather)?

Help may be near.

And it’s free.

The state Division of Emergency Management & Homeland Security and CT Volunteer Organizations Assisting in Disasters has engaged the Southern Baptist Disaster Relief organization to offer free help.

Assistance includes assessment, removal of damaged items and materials, cleanup and mold mitigation.

To request assistance, call 203-628-6978. Leave a message after the beep with your name, phone number, address, and a brief description of your needs.

.

=================================================

One cancellation already for tomorrow: The Fun Fest at the Unitarian Universalist Congregation in Westport.

A new date will be announced soon.

==================================================

Two important projects — one (hopefully relatively) short-term, the other longer — are on the agenda when the Board of Finance meets October 7 (7:30 p.m., Town Hall auditorium; livestream at www.westportct.gov).

The board will be asked to approve an appropriation of $172,5000, for the design cost and permitting of the Jesup Road bridge replacement.

The short, often unnoticed span was weakened during the September 13 flood. The road is closed, shutting off an important route from Imperial Avenue to the police station, Library and Levitt Pavilion.

The project has been estimated to take 12 to 18 months. Residents and town officials hope for an expedited process.

The second request is for $176,000, for the initial assessment and “new vs. renovation comparison study” for the future Coleytown Elementary School project.

This would be an initial step in a long-awaited process for the 1950s-era building.

The BOF will also consider a request for $1,119,000, for consultant services in support of the Safe Streets and Roads for All, Supplemental Planning and Demonstration Grant.

The now-closed Jesup Road bridge.

==================================================

The state Department of Transportation will mill and resurface Route 57 (Weston Road) from Easton Road (Route 136) to just south of the Weston town line, beginning Sunday.

The work is expected to be completed by October 9, weather permitting.

Although this section of Route 57 was resurfaced in June, the top layer of asphalt is to be replaced due to an issue with the paving material.

The tentative start date for the milling portion of the project is scheduled to begin Sunday night, and continue for approximately 3 nights.

The tentative start date for the paving portion is the night of Wednesday, September 30, 2026, and continue for approximately 3 nights.

==================================================

The Westport Prize for Literature goes to … “Good People.” The debut novel by Patmeena Sabit was selected by an independent jury from a field of finalists that also included “Transcription” by Ben Lerner and “The Children” by Melissa Albert.

Now in its 4th year, the $10,000 annual prize honors original works of literary fiction published in the US that are both relevant and timeless. The prize is administered by Westport resident volunteers.

Sabit will receive the prize at the Library on November 12 (7 p.m.), followed by a conversation with Meghan O’Rourke, editor of The Yale Review. Copies of Good People will be available for purchase at the event, and Sabit will sign books afterward. For more information about the event, click here.

==================================================

How often do you get a chance to hear a Grammy-nominated singer in Westport … for free?

(Besides the Levitt Pavilion, of course.)

Next Friday (October 2, 7 p.m., Unitarian Universalist Congregation in Westport), baritone Sidney Outlaw and pianist Piotr Kozlowsk presenting the Connecticut premiere of “26 Ways of Looking at a Black Man,” with music by B.E. Boykin and poetry by Raymond Patterson.

The UU says, “This is an opportunity not simply to hear a world-class performer, but to gather around a deeply meaningful work that centers Black artistry, identity and lived experience.”

Questions? Contact Micah Kracja: 203.227.7205, ext. 18; micah@uuwestport.org.

==============================================

The Ned Dimes Marina hasn’t gotten a lot of love lately.

Perhaps today’s “Westport … Naturally” photo will show it in a more serene light.

(Photo/Karen Como)

==================================================

And finally … on this date in 2001 — 20 years after his death — the voice of Bob Marley ushered satellite radio onto the air. It promised listeners greater variety  — for a price — with the launch of XM Satellite Radio. It was the first worldwide broadcast of a satellite radio station

(We’re getting ready for another weekend. As always, “06880” will be here with whatever news you need. And as always, we’re grateful for any readers who click here to support our work. Thank you!)

[OPINION] Flood Unleashes Concerns About Greens Farms Apartment Plan

After Sunday’s 7-inch “rain bomb,” a neighbor of the proposed redevelopment of 55 Greens Farms Road — which would replace 1 of 2 office buildings next to Assumption Cemetery with 250 apartments, 30% of them affordable under state formulas — writes:

During Wednesday’s Conservation Commission hearing, members prudently chose to continue the review until October rather than vote on the application, for which the surrounding community is grateful.

A proposal of this scale and sensitivity deserves a dedicated hearing. It is difficult for both the Commission and the public to adequately consider such a complex application after hours of reviewing important but perhaps less consequential matters.

Wednesday evening’s presentation by the applicant’s team of professionals was impressive, visually compelling, and optimistic.

However, it also appeared to lack details that warrant further examination.

Aerial view of Greens Farms Road office buildings. The southern one (bottom) would be demolished, for 250 apartment units.

Several aspects of the proposal were presented, including but not limited to green spaces, walkways, plantings, water management and maintenance plans.

But it failed to elaborate on the true scale of the proposal in more detail — for example, number of units, coverage comparison and parking, under the rationale that they fall outside the Conservation Commission’s purview.

While that may be technically correct, some of these issues have significant implications for stormwater management, impervious coverage, and environmental impacts, all of which are directly relevant to conservation concerns and fall under the Commission’s oversight, in addition to the Commission’s request for a side-by-side comparison.

During the presentation, a consulting engineer stated that the property did not experience what was characterized as complete flooding during the recent 200-year storm event, contrary to the image below with a vehicle partially submerged in floodwaters.

Respectfully, it begs the question of what standard is used to define complete flooding. By any reasonable measure, substantial portions of the property, both above and below grade, were underwater.

The parking garage appeared to have flooded, roadways providing access to and from the property were inundated, and adjacent wetlands overflowed significantly, breaching abutting properties.

This was one for the record books — but will it be the last one?

Last Sunday’s flood, at 55-57 Greens Farms Road.

Equally concerning are the effects on neighboring properties. At least one concerned resident bordering the wetlands observed water levels extending well beyond that area. One would argue that these conditions constitute extensive flooding, and should be acknowledged when evaluating future development impacts.

Although parking may not fall directly under the Conservation Commission’s jurisdiction, impervious coverage and land disturbance certainly do. The proposal contemplates accommodating all required parking beneath the building footprint, rather than in traditional surface lots.

On paper, this is an attractive concept. However, can the required parking be fully accommodated under the building footprint as proposed? It doesn’t take long to understand the true scale of the proposal.

On the site plan provided by the developing team, as part of the meeting materials, you can see the existing back building that is planned to remain, at least for now, next to the new proposed larger building, shown in beige with pale green donut holes representing courtyards within the building. The 2 existing buildings are identical in size; the proposal is far from it.

The new building (bottom) would be substantially larger than the current one.

The question is not what’s under the Commission’s purview, but whether safeguards should be established now as the proposal is further detailed. Should the final site plan design deviate from the proposal as it moves through other agency approvals, no modifications should be granted without a comprehensive public review process, including notice and hearing requirements.

Too often, substantial project modifications occur later in the approval process when public scrutiny has diminished. If or when the development proceeds, all of Westport deserves assurance that future changes will not undermine the environmental commitments being presented today.

The broader environmental impacts of this development also deserve careful consideration. The proposal includes extensive native plantings, pollinator habitats, and attractive landscape features. While these elements are commendable, they do not eliminate the significant ecological disruption associated with large-scale construction.

Construction activity remains a major source of environmental disturbance through habitat fragmentation, waste generation, erosion, sedimentation, and impacts to surrounding ecosystems, particularly where wetlands are involved, even with protections in place.

Could the Sherwood Mill Pond watershed basin also be impacted, as it is connected through smaller waterways? Adaptive reuse rather than a redevelopment may not be appropriate here, but it provides many lessons not to be ignored.

Sherwood Mill Pond is not far from 55 Greens Farms Road. 

The development team also referenced future maintenance plans intended to preserve the property’s environmental performance. Such plans are encouraging in theory, but they ultimately rely on consistent implementation and enforcement.

Who will ensure compliance years after approvals have been granted, construction has been completed, and the dust has settled?

Another voiced concern during the hearing: The town’s resources for monitoring private properties are limited. The site’s existing office park likely had maintenance obligations, yet residents have witnessed years of neglect, including recurring litter and debris entering the watershed from adjacent roadways and highways, using the roadway as a trash conveyor belt.

Another point articulated at the hearing: Many times, it is the residents who volunteer to go up and down this stretch of road and collect the garbage. A high-density development will only add to the problem.

A redevelopment could be inevitable; the owners have made a substantial financial investment and intend to seek a reasonable return, but at what expense?

The objective is not to prevent development (although it would be ideal), but to ensure that it receives even more rigorous scrutiny such a consequential project deserves.

We have not even touched on the traffic this will create on an already overwhelmed road, not to mention the everlasting debate about what will happen to the beloved Cribari Bridge once it’s further overwhelmed and likely becomes structurally inadequate.

This section of Westport may appear as the forgotten land, but it is home to families, many of whom have lived here for generations. They have repeatedly dealt with flooding due to poor upkeep of the waterways, never-ending traffic, and are bracing for additional impact. But they are hopeful for some reprieve.

Perhaps the new development will, in fact, improve the water management capability of the property and be a positive addition to the community.

But at the moment, the facts and scale are not feeding much confidence or conviction to those who will be impacted the most. Rest assured, the ripple effects of this not-so-small pebble in the pond will be felt far beyond the adjoining properties.

(“06880” Opinion pages are open to all. Send submissions to 06880blog@gmail.com. To make a tax-deductible contribution supporting our work, please click here. Thank you!

 

Town Launches Storm Recovery Web Page

Town  officials have posted a Storm Recovery webpage.

The site (click here) will help residents and businesses affected by the September 13 flooding find assistance, insurance information, repair guidance and town updates, all in one place.

The page includes recovery resources from the Department of Human Services, and guidance from the Planning & Zoning Department about storm damage repairs and permitting requirements.

“We know many residents and business owners are still cleaning up, dealing with losses and figuring out what comes next,” says 1st Selectman Kevin Christie.

“Our goal is to make it easier to find useful information and connect with people who can help.”

Norwalk Avenue flooding near Compo Beach, on September 13.

The webpage includes:

Reporting storm damage: The state’s damage survey for residents and businesses to report flood damage and help document the extent of the storm.

Insurance help: Connecticut Insurance Department contact information and guidance for residents and businesses with coverage or claims questions.

Help with recovery needs: Human Services contacts and a downloadable guide covering food, housing referrals, financial assistance and other resources.

Repairs and permits: Town guidance on approvals that may be required before beginning storm repairs or reconstruction, with Planning & Zoning contact information.

Town updates: Storm-related news releases, and links to sign up for emergency alerts and town news.

Additional updates will be added as recovery work progresses.

Residents and businesses affected by the flooding are encouraged to complete the state’s damage survey.

NOTE: The survey is not an insurance claim or application for assistance and does not guarantee aid. Insurance coverage and claims should be addressed separately with your insurance company.

Town’s Flood Update: Jesup Road Bridge, Compo Pumps, More …

1st Selectman Kevin Christie offers an update, following Sunday’s 7-inch “rain bomb.”

The Jesup Road bridge at Imperial Avenue remains closed, while engineers assess significant storm damage and required repairs. Assessments of roads, culverts, storm drains and stormwater facilities also continue.

The Jesup Road bridge at Imperial Avenue remains closed while engineers assess storm damage and required repairs.

“We understand the distress that comes with damage to a home or business, and residents deserve a clear understanding of what our stormwater infrastructure can handle,” says director of Public Works Larry Roberts.

“Even as we assess this extraordinary storm, repeated flooding makes preparing for future events essential. We will continue to work to strengthen public infrastructure, and work with property owners on practical ways to reduce future damage.”

On Sunday, the wastewater treatment plant’s inflow peaked at a rate of approximately 12 million gallons per day — far above its usual 1.75 million per day.

Pump Station No. 10 (behind HomeGoods) flooded and shut down. The Center Street pump station sustained damage when Muddy Brook overflowed.

Town teams are assessing culverts and drainage structures affected by sediment, landscaping material, displaced dumpsters and other debris, including whether obstructions affected drainage in particular locations.

Dumpster near downtown. (Photo/Sal Liccione)

Follow-up work includes clearing obstructions, cleaning catch basins and checking equipment.

In Compo Basin, DPW reports that the marina’s check valves are operational.

The Gray’s Creek valve was open as intended; it prevents tidal flooding, and closing it during this low-tide rainfall event would not have helped drainage, officials say.

DPW has inspected the basin’s automatic pump and found it operational. However, officials cannot verify its operation during the storm because it does not record activation history.

DPW plans to observe the pump during the next major storm to verify its activation. DPW is also reviewing reports of lingering standing water near Bradley Street and Fairfield Avenue, and debris in nearby drainage structures.

Standing water on Bradley Street, 24 hours after rain ened.

Town officials are coordinating with state emergency management officials on regional impacts, damage documentation and potential recovery resources.

Residents and businesses should report September 13 property damage through the State’s CrisisTrack survey. Reports help document the full extent of damage, and support the process of determining whether the state may be eligible for FEMA or Small Business Administration disaster programs. The survey is not a claim or application for assistance, does not guarantee aid and does not replace reporting damage to an insurer.

Residents and businesses with questions about flood insurance coverage or difficulty with a flood-related claim can contact the Connecticut Insurance Department’s Consumer Affairs team: 800-203-3447 or 860-297-3900, or by email at insurance@ct.gov.

Christie says, “Our hearts go out to the residents and businesses recovering from this flood, including those displaced from their homes or unable to reopen their businesses.

“Many are still cleaning up, and some face extensive repairs and a prolonged recovery. We are focused on addressing immediate needs and supporting the work ahead.

“I am deeply grateful to our entire DPW team and all of our responding departments for their tireless work throughout the storm and the continuing recovery.”