Between Long Lots Elementary School and Parker Harding Plaza, there hasn’t been much discussion lately on the future of the William F. Cribari Bridge.
But the 135-year-old swing span — historic, beloved, quirky, narrow — is not getting any younger.
William F. Cribari Bridge (Drone photo/John Videler for Videler Photography)
The state Department of Transportation has spent several years studying the bridge, and planning its replacement. Any new one — if built with state and/or federal funds, that is — would have to meet current standards.
That would probably mean a bigger, wider structure. Meaning: One large enough to accommodate trucks coming off I-95.
Sources say that an environmental assessment is being prepared, though by a different company than originally hired.
The belief is that DOT will recommend replacing — rather than renovating — the existing bridge (which is listed on the National Register of Historic Places).
A long-ago trolley travels over the Cribari Bridge.
There is no new information on the state DOT website. The latest “news” was posted in 2019.
“06880” asked State Representative Jonathan Steinberg, who sits on the Transportation Committee, for a status update. He says:
It goes without saying, with each passing day, it deteriorates further. I don’t know the current status of the supporting piers, but I’d hope that DOT is monitoring and would let us know if it was approaching dangerous condition. And it’s fair to wonder why Westporters tolerate a structure so decrepit looking. Hardly a Westport icon!
In my last casual conversation with my contact at DOT, some months ago, she more or less confirmed their strategy of waiting for the town to respond to the options they put on the table now years ago. DOT sees little benefit in pushing hard for resolution without any partner in town government — at least as long as the bridge remains safe.
Cribari Bridge, looking west. (Photo/Fred Cantor)
In my opinion, our de facto plan to ignore the problem and avoid controversy is yielding to a vocal minority and risking a genuine traffic crisis should that bridge go out of commission for an extended period. Isn’t crossing the river in Westport challenging enough without losing a crossing point?
I believe we can talk through our concerns — such as keeping 18-wheelers from using the bridge — and come up with a satisfactory plan which preserves the bridge’s character while making it safe — actually safer (wider) — for the long hall. Remember: even if we had a plan today, it will take years to implement the fixes, perhaps including a temporary bridge.
So I can’t illuminate current status for you. Ultimately, the first selectwoman bears responsibility for communicating with DOT the town’s preferences and seeking resolution.
I just hope we don’t see a headline to your column reading: “Cribari Bridge closed indefinitely; Westport traffic grinds to a halt.”
1st Selectwoman Jen Tooker says: “The issue still sits with the state. I’m asking for an update from them. I’ll with you when I hear from them.”
(“06880” is your source for hyper-local journalism. Please click here to support our work, with a tax-deductible contribution. Thank you!)
Judy Collins — the singer/songwriter who has entertained and inspired fans since the 1960s — is coming to the Westport Country Playhouse.
She’ll be onstage April 12 (8 p.m.). Encore Club members can buy tickets now; public sale begins January 26 at noon. Click here for more information.
Also ahead at the Playhouse: “All Things Equal: The Life & Trials of Ruth Bader Ginsberg.” Written by Rupert Holmes, it’s a one-woman play in which the Supreme Court justice welcomes a friend of the family to her chambers to convey a sense of her career, and personal life.
The show is May 3 and 4 (8 p.m.), and May 5 (3 p.m.). Click here for more information.
And on July 25 the Bacon Brothers bring their unique mix of folk, rock, soul and country music to the Playhouse. Click here for more information.
Westporters — especially seniors and those with low to moderate incomes — can once again take advantage of the town’s no-cost full-service AARP/VITA/IRS Volunteer Tax Assistance Program.
On-site personal counseling is available by appointment at Town Hall (Mondays from 1 to 7 p.m.) and the Senior Center (Wednesdays from 9 a.m. to 4 p.m., and Thursdays from 9 a.m. to 12:30 p.m.), starting January 22. Call 860-590-8910 for an appointment, or click here.
The “SimplyCT” counselor group that services Westport prepared and filed more than 7,000 returns last season – almost all electronically. Federal refunds of over $10 million were received by their clients..
The program is administered by Westport’s Department of Human Services.
An incident that began when 2 people illegally entered a home and attacked 3 others on Friday morning in Old Saybrook ended in Westport.
One, armed with a baseball bat, injured the homeowners. The suspect then removed an adult woman from the home against her will, and fled.
Old Saybrook police sent an alert to law enforcement agencies to be on the lookout for a car with New York license plates carrying the victim.
Westport police located the vehicle when it was getting gas. They arrested the suspects, seized the bat, and took the woman who had been taken from her home to Norwalk Hospital, with non-life threatening injuries.
(Click here for the full story. Hat tip: Betsy Pollak)
Remember the I-95 Saugatuck River bridge replacement project last fall?
Relive all the key moments — in a lot quicker time than it took (though of course, kudos to all who accomplished the work in just 2 weekends) — in this very cool video, from the Connecticut Department of Transportation:
Badass Bagels — the popular shop in the Sugar & Olives space just over the Norwalk line, owned by Westporter Jennifer Balin — has just opened a new location in Armonk, New York.
“It’s totally our brand,” she says.” The space is warm, cozy, and decked out with vintage furniture from Bridgeport’s Mongers Market (where they have another location).
Badass’ expanded sourdough bagel offerings include 10 varieties: everything, whole wheat everything, golden sesame, black sesame, Himalayan blue poppy, smoked sea salt, plain, cinny raisin, pumpernickel caraway everything, and naked whole wheat. (Ramp bagels are offered in May.)
There are plenty of spreads and butters too, like “sweet and lovely” with Westport honey.
Badass Bagels also sells coffee beans and whole espresso/coffee.
Stores hours in Norwalk and Armonk are Wednesdays through Sundays, 8 a.m. to 1 p.m. They sell at the Westport Farmers’ Market and Double L Market too.
The Senior Center Super Bowl “tailgate party” is a great one. And you don’t even have to hang out in the parking lot.
It’s indoors. This year’s event (February 11) includes a “final score contest,” and a Friends of the Westport Center for Senior Activities Service Award presentation to the wonderful Patty Kondub, who does so much in so many ways for the senior community.
The menu includes hot dogs, chips, spring rolls and dessert.
Staples High School state champion football and field hockey teams, and Staples and Westport PAL cheerleaders will be there too.
All ages are welcome. Lunch is at 12:30; the party begins at 1:30.
Thursday’s Westport Weston Chamber of Commerce Business After Hours event drew a large crowd to VFW Joseph J. Clinton Post 399.
VFW Auxiliary member Patty Kondub’s meatballs complemented the fun vibe, filled with networking opportunities and great music afterward (Jazz at the Post).
Enjoying Business After Hours (from left): Virginia Ferrari, Paul Liebowitz, Patty Kondub, Sal Liccione, Matthew Mandell.
Colleen Sadick is a beloved Coleytown Elementary School professional. The CES community has rallied around her as she battles bone marrow cancer.
As Colleen has had to step back from her 2 jobs (she is also a behavioral mentor), her income has been impacted. CES organized a GoFundMe page to help the family with medical expenses, transportation, post-treatment care and daily costs.
After a number of interviews, the Democratic Town Committee nominations committee will recommend Abby Gordon-Tolan for the Board of Education vacancy, and Joe Scordato for the Zoning Board of Appeal vacancy.
The full DTC will vote Monday on the recommendations.
Merrill Jay Forgotson – an accomplished community banker and fierce advocate for justice and equal opportunity – died peacefully in his sleep on Wednesday, January 17, at his Westport home. He was 81.
The New York City native credited his mother and father, a World War II hero, for challenging him to lead a life of purpose, centered on education.
He earned a BS in finance from Northeastern University followed, by a JD from Boston University and an MBA from Western New England College.
Jay paid his way through college and law school by washing dishes, serving ice cream, and packaging newspapers and magazines overnight for early morning delivery.
Motivated by the U.S. Supreme Court’s landmark decision in Gideon v. Wainright in 1963, which affirmed a constitutional right to legal counsel for anyone charged with committing a crime, Jay started his career as a defense attorney
He transitioned into finance, starting at Mass Mutual and advancing to become general counsel at Barclays Business Credit.
In 1990 Jay joined People’s Bank as senior vice [resident/chief credit administration officer. He also served as chair of the Connecticut Anti-Defamation League, where he shaped diversity programming to combat hate and discrimination in all their forms.
In 2000, Jay left People’s to run Cornerstone Bank in Stamford. Running the profitable mission-centered community depository was one of the joys of his professional life.
During a brief sabbatical, Jay served as dean of the business school at the University of Bridgeport. But community banking kept calling. Jay served as CEO of BNC Financial Group, and started the Bank of Fairfield and Stamford First Bank.
After retiring in 2013 he enjoyed family and friends in Connecticut and Sarasota, Florida; volunteered for non-profits; consumed current events and advocated for fairness, and photographed.
Jay is survived by his wife, Janis Reader-Forgotson; sons Nathaniel, Josh and Matthew; grandchildren Evan, Ianto, Floriana, Zachary and Benjamin, and dogs Lola and Cimba. He was predeceased by his younger sister Barbara Garavuso.
Donations in lieu of flowers can be made to ADL Connecticut. A Memorial Service will be held tomorrow (Sunday, January 21, 12:30 p.m., Temple Shalom. Norwalk).
And finally … Peter Schickele, a serious concert musician and also the genius behind madcap PDQ Bach, died Tuesday near Woodstock, New York. He was 88. Click here for a full obituary.
(How to amuse yourself on a cold winter weekend? Read about everything happening in town, now and in the future. If you like what we do, please click here to support our work. Thank you!)
The new and massive I-beams at northbound I-95 Exit 17 have residents wondering: Is there really going to be a new bridge there?
New construction on Saugatuck Avenue, at I-95. (Photo/Tracy Porosoff)
Not exactly.
Sometime this fall, the Saugatuck Avenue bridge will be replaced, using “accelerated bridge construction.”
A new bridge will be constructed adjacent to the existing bridge. That’s what the new I-beams will support.
Over a single weekend (Friday evening to Monday morning), the current bridge will be demolished. The new structure will be installed in its place.
The date for that complicated (but quick) work has not been set. The entire State Department of Transportation project — which extends south to Norwalk’s Exit 16 — is projected to run through November 1, 2024. (Hat tip: Andrew Colabella)
An enormous crowd enjoyed margaritas, special watermelon drinks, and the New York-based taqueria’s signature dishes.
The official opening is Monday (August 7). Click here for more Tacombi info.
Enjoying Tacombi last night (from left): Westport Volunteer Emergency Medical Service president Mike Burns; 1st Selectwoman Jen Tooker; hosts Hightower Financial Group and Judy Michaelis; Tacombi manager; Police Chief Foti Koskinas; WVEMS vice president Larry Kleinman. (Photo/Dan Woog)
Also last night: The Soul Drivers rocked the Levitt Pavilion, with their Memphis Soul sound. Tonight (Saturday) it’s Theo Kandel; tomorrow, Quadrature. Click here for (free) tickets, and more information.
Soul Drivers (Photo/Dinkin Fotografix)
Not far away last night, Massive Diva entertained diners at Walrus Alley. They’re there — right next to Don Memo — every Friday night. Tonight (7:30 to 11) it’s the always-popular Zambonis.
Westport firefighters responded to a house fire on Warnock Drive, off Easton Road.
Most damage was limited to the exterior and front attic space. There were no injuries. Westport Emergency Medical Service and Westport Police assisted.
The cause of the fire is under investigation.
Warnock Drive fire. (Photo courtesy of Westport Fire Department)
Ray is not done trying to solve our town’s traffic woes. Here’s his update.
Last week I met with 2 town officials. I heard about their understanding of the 4 specific traffic problem locations, as well as their current plans and ideas on possible solutions.
The meeting was hosted by operations director Thomas Kiely and Officer Andy D’Amura of the Westport Police Traffic & Safety Department.
I had a chance to express how serious these problem locations have become, and how I thought these issues have not been given enough priority from local officials.
Town operations director Thomas Kiely.
They were both well versed in their understanding of these traffic problem areas. Both have very good understanding of traffic issues. Thomas Kiely spent 16 years as a State Police highway patrol officer, while Officer D’Amura has been involved with traffic problems for many years in Westport.
It was obvious these 2 men felt strongly that they as well as the community want to see solutions and action.
They pointed out the big stumbling block is that all 4 of the problem areas I brought forward are on state highways. The Department of Transportation controls all planning, changes, funding and ultimate approval of any projects the town and state would like implemented.
State DOT has a lot of roads and highways on their workbench. Westport’s requests for consideration are on a long list of projects to be addressed by DOT.
Kiely and D’Amura went over some changes and improvements in the pipeline for implementation and action.
I think these changes will produce a small improvement in Saugatuck traffic congestion, but a bigger benefit at the new roundabout Weston Road – Easton Road intersection.
The Westport Police Department has a plan to place trained traffic control officers at the Riverside Avenue/Bridge Street intersection on morning and evening commute hours, as well as doing more traffic officer control at the Route 33 (Riverside Avenue/Wilton Road)/Post Road West intersection, and its commute hour massive congestion.
We also discussed the importance of traffic signal optimization on the entire Westport section of the Post Road, and the 3 other areas (including Wilton Road/Kings Highway North).
Traffic at the Kings Highway North/Wilton Road intersection …
It is obvious that unless officials in Westport and the state come together with greater timing and vigor, the traffic problems we now suffer in Westport will continue to grow — and become a larger set of problems.
A day later I had a productive meeting with State Representative Jonathan Steinberg. He reached out after reading my opinion piece on “06880.”
We discussed the same areas of concern, as well as possible action he and I can move forward on to address making these issues a higher priority for the town.
Steinberg is a longtime Westport resident. He has been affected by these traffic problem issues, and has a great understanding of state agencies for how problems like ours are identified and dealt with.
… and, not far away, the Wilton Road/Riverside Avenue/Post Road West cluster****.
It’s very important for residents and businesses of Westport to realize that unless we can bring town and state officials, and DOT, into new action and priorities, the solutions we seek will just stay a “kick the can down the street”problem.
I want Westport residents and businesses to know I am committed to continuing to interface with any officials and interested individuals to “push and shove” this town into better traffic flow.
I have received a few emails from town residents who wish to help and contribute to this action effort. I would love to hear from others additional who want to join the effort. My email is reelray@msn.com.
(“06880” will continue to report on Westport’s transportation issues — and all other concerns in town. but we need your help. Please click here to support our work. Thank you!)
Work is imminent on a state Department of Transportation Post Road improvement project.
It includes road widening, the addition of turn lanes and sidewalks — and the removal of up to 100 trees.
From Volvo of Westport to Cumberland Farms — and continuing east to the trees in the median toward New Country Toyota — workers will cut decades-old trees.
The 2 in front of Sakura — the Japanese restaurant whose name means, literally, “cherry blossom” — are also on the chopping block.
One of the trees possibly slated for removal near Sakura.
But a meeting yesterday may have brought those 2 beautiful trees, at least, a reprieve.
State DOT officials planned to meet yesterday in the Sakura parking lot with workers, to coordinate the upcoming project.
Proposed work around Sakura, at the Post Road/Roseville/Hillspoint intersection.
Also there: Westport Town Representative Meeting members Andrew Colabella, Matthew Mandell, Harris Falk, Lou Mall and Don O’Day; Tree Boad members Ed Picard and Dick Stein; Betsy Newman of Earthplace; Sakura owner Nicole Chen, and landowner John Klinga.
And Westport Public Works director Peter Ratkiewich and town engineer Keith Wilberg.
Plus News12.
When the DOT crew saw the news cameras, they hesitated. They expected a private site visit, not a public meeting.
The Westport officials agreed to merely listen in to the discussion. Eventually, they talked.
DOT representatives, workers and Westport officials met outside Sakura yesterday. (Photo courtesy of Andrew Colabella)
DOT noted that planning for the project began nearly a decade ago. A public information session was held at Town Hall on July 9, 2019 (and previewed on “06880” — though at that point the project start date was the summer of 2021).
Only a dozen or so people attended that meeting.
A follow-up story on “06880” a few days later focused on curb cuts, and entrances and exits of parking lots. It drew 9 comments.
No one mentioned trees.
At Sakura yesterday, a DOT official said that the time to protest the tree cutting was long gone. He noted that no trees not in the right-of-way would be touched. But many are in that zone.
Still, there was hope. The final decision about the fate of Sakura’s 2 weeping cherry trees is now in the hands of Eversource. They may assent to trimming, rather than removal.
A crocus offers hope to one of the Sakura willow trees. (Photo/Harris Falk)
Meanwhile, though the Tree Board has no jurisdiction — US 1 is a state road — they strongly support preservation of the Sakura trees. First Selectwoman Jen Tooker has indicated support for the board.
Whatever the fate of 2 of Westport’s most iconic — and beloved trees — one thing is certain: Nearly every other tree on that corridor will be gone.
Get ready for some traffic tie-ups too. Construction is slated to end in April.
Of 2025.
4 trees that will soon be cut at Linxweiler House on the Post Road, between McDonald’s and Fresh Market. (Photo/Bob Weingarten)
The ongoing, noisy, environmentally gruesome work being done at and around I-95 Exit 17 has many “06880” readers wondering: “WTF?”
Here’s the official word, from the Connecticut Department of Transportation’s “Welcome to the I-95 Norwalk Westport Project” website:
The Connecticut Department of Transportation announced the start of construction for the I-95 Resurfacing and Median Reconstruction Project to begin July 2022. Anticipated end date is November 1, 2024.
The purpose of this important roadway job is to improve driver safety. This will be achieved by;
Reconstruction of the center median and right shoulders along with resurfacing of the highway mainline and ramps at Interchanges 16 and 17.
Median will be reconstructed consistent with other stretches of I-95 to provide a 6-foot-wide capped concrete barrier section.
Wider left and right shoulders where possible.
Improve drainage by replacing and re-routing drainage structures
Replacement of the existing highway illumination system
Install new realigned Incident Management System (IMS)
Install new guide rail
Utilize wet retroreflective pavement markings to provide increased visibility of pavement markings in wet conditions.
Connecticut Department of Transportation I-95 project.
Additionally, several bridges along the corridor will have repairs and specifically, the I-95 over Route 33 (Saugatuck Avenue) will be replaced. A synopsis of the anticipated bridge improvements include:
The bridge reconstruction of I-95 over Saugatuck Ave. (Route 33/136) will be replaced, utilizing an Accelerated Bridge Construction Methods called Lateral Slide, which minimizes the disruption to I-95 commuters.
The I-95 over Franklin Street and I-95 over Saugatuck River bridges will have concrete deck repairs, the replacement of expansion joints and installation of new standpipes
A portion of the structure will be replaced over a weekend, in which 2 lanes of traffic will be provided in each direction.
Proposed landscaping at and around I-95 in Saugatuck. (Click on or hover over to enlarge.)
Other improvements will include the expansion of the Hendricks Ave Park and Ride commuter lot, improved storm water quality treatment, utility relocation, I-95 NB Exit 16 on-ramp extension and the extension of the Yankee Doodle Trail.
Traffic will be maintained at all times during the 6 stages of construction to minimize disruptions to the traveling public.
That’s the official word.
“06880” reader Scott Singer has his own thoughts:
Do you or your sources have any info on who among our elected officials are responsible for monitoring the CT DOT work at Exit 17?
They have thus far removed every possible tree and natural sound/visual boundary, despite their map and plan of maintaining existing trees. It looks like a war zone there.
Exit 17 (Photo/Leslie Ogilvy via Westport Front Porch, Facebook)
For all the worry about Saving Saugatuck and trestle bridge repair, nothing is being done to care for the primary entrance to town.
What is the plan to replant? It’s horrendous there.
(“06880” relies on readers’ questions — and contributions. Please click here to support our work. Thank you!)
Connecticut’s Department of Transportation begins work next year on several local crosswalks — including the notorious “worst intersection in the state” (Routes 1 and 33, aka Post Road West, Riverside Avenue and Wilton Road).
The DOT will also work on:
Route 33 (Wilton Road) at Merritt Parkway Connector and Spring Hill Road
Route 57 (Weston Road) at Broad Street and Good Hill Road (Weston)
Route 33 (Saugatuck Avenue) at I-95 southbound ramps
Route 1 (Post Road East) at Playhouse Square Shopping Center
Route 1 (Post Road West) at Sylvan Road
Route 1 (Post Road East) at Turkey Hill Roads North and South
Sherwood Island Connector at Greens Farms Road and Post Road East.
The good news: Upgrades include countdown pedestrian indicators, accessible pedestrian push buttons, and “concurrent pedestrian phasing.”
The bad news: There are no actual traffic, sightline or other improvements.
The timetable: Design plans are expected to be completed in February, with advertising for construction in April.
Last week, when Y’s Men acting gardening chair Chuck Greenlee learned that a spotted lanternfly was spotted at the Westport Community Gardens, he did 2 things.
They quickly replied: “Thank you for your inquiry concerning spotted lanternfly. The insect you have photographed is indeed a SLF. Your town is already known to be infested. For tips on dealing with SLF, please click here. Should you find any more insects, please kill them immediately with any means at your disposal. Thank you again for your interest.”
Speaking of the environment: Tickets are on sale now for Earthplace’s famed Woodside Bash fundraiser. It’s October 1 (7 p.m.), under the stars and beside a firepit.
Though it’s adults-only, kids are welcome the following day (October 2, 10 a.m. to 3 p.m.), for the also-annual Fall Festival. Earthplace buzzes with a corn pool, obstacle course, climbing wall, food trucks and more. Click here for tickets.
=======================================================
Last week’s story on Ed Capasse’s star turn as a Staples High School marching band member/Saturday Evening Post cover model cast a new light on Stevan Dohanos’ famous 1946 painting.
Ed Capasse is in the upper left.
It used to be sold at the Westport Historical Society. Now it’s available only online.
But — as former Westporter/longtime Oregonian/avid “06880” reader Robert Gerrity discovered — there are plenty of places to purchase it. Among them:
Speaking of posters: Yesterday’s music memories from Woodstock — the “lotta freaks!” festival that ended 53 years ago (!) today — brought an email from longtime Westporter Matt Murray.
Plus this photo:
Matt explains:
“This is an original. I worked for the guys who started and funded the concert (Joel Roseman and the late John Roberts). They were partners in the NYC recording studio, Mediasound.
“I was an assistant engineer and gopher (go for this, go for that). Another guy and I saw a stack of these in their office. We asked if we could have a few. Sure!
“Still have ’em, 47 years later.”
Matt adds: “For the studio’s Christmas party, leftover Woodstock tickets were used as bar chits. Being youthful, I used mine for drinks. The bartender tore them in half. A fellow worker thought better of that idea, and hung on to his tickets. Smart person.”
The state Department of Transportation’s announcement of possible work on the Route 136/Route 57 intersection — where Main Street, Weston Road and Easton Road meet in a confusing number of ways — is welcome news.
But it’s not the first plan.
Nor is it the second. Or even the third, fourth, fifth, sixth or seventh.
Former 2nd Selectman Avi Kaner sends along a slew of previous solutions to the confounding confluence. All were prepared by ConnDOT, and discussed with town officials between 2004 and 2006.
Here they are. Click on or hover over each image to enalrge.
One envisioned 3 small roundabouts:
Another showed one large rotary:
Five others involved some combination of road widening, adding turning lanes, and eliminating or modifying the center island:
As the saying goes: Whatever goes around, comes around.
Or, in the case of the roads near Exit 42, whatever goes around may crash into whatever else goes around, unless everyone going around pays close attention.
Westporters learn to carefully navigate it. Visitors coming off Merritt Parkway Exit 42 are completely flummoxed by it.
At last — after decades of confusion — the Route 57 (Main Street)/Route 136 (Easton Road and Weston Road) cluster**** may get some improvement.
The state Department of Transportation has designed a plan. They’ll discuss it in a virtual public information program this Thursday (June 9, 7 p.m.), with a presentation followed by a question-and-answer session.
The meeting will be recorded. To access the meeting, provide comments or ask questions, click here (then scroll down to “Live Event Links”).
The plan includes replacing the existing flashing light with a full traffic signal, and widening the road.
The state Department of Transportation plan. Click on or hover over to enlarge.
Right-of-way impacts could include partial land acquisitions and easements.
The project is in the early stages of concept development. No funding or schedule has been identified. The public meeting is to discuss feasibility and solicit feedback.
The state Department of Transportation’s environmental assessment report on the William F. Cribari Bridge will be released next month.
But Deputy Commissioner Mark Rolfe has told 1st Selectman Jim Marpe that its conclusion — and the DOT’s recommendation — is to replace the bridge with a new structure that meets Federal Highway Administration standards.
Many Westporters — fearing traffic on a bigger, new span — have pushed instead for renovation of the 133-year-old structure.
However, Rolfe offered Marpe an alternative: The state could transfer ownership of the bridge to the town of Westport, and re-route Route 136 (Bridge Street and Compo Road South).
The catch: The town would be responsible for operation, maintenance and repair of the Cribari Bridge.
Is that a bridge too far for Westport?
Stay tuned.
William F. Cribari Bridge: The debate continues. (Photo/Sam Levenson)
Click here to help support “06880” via credit card or PayPal. Any amount is welcome, appreciated — and tax-deductible! Reader contributions keep this blog going. (Alternate methods: Please send a check to “06880”: PO Box 744, Westport, CT 06881. Or use Venmo: @blog06880. Or Zelle: danwoog@gmail.com. Thanks!)
GET THE “06880” APP
The “06880” app (search for it on the Apple or Android store) is the easiest way to get “06880.” Choose notifications: whenever a new post is published, or once or twice a day. Click here for details.