The Hales Road bridge has been open to traffic for over 3 months.
The “Construction Ahead” signs will probably remain up for another 3 decades.
But that’s not what caught the eye of an alert “06880” reader. He’s more interested in the top sign:
That is indeed a low clearance: 14 inches.
Drive with care.