Site icon 06880

Bedford Square Is Complete. Another Intriguing Project May Come Next.

Since it opened 2 weeks ago, Bedford Square has become Westport’s newest destination. Folks flock there to shop, eat, and hang out in the courtyard.

David Waldman’s project — which took many years to conceive and sell to town boards, and another 2 years to construct — seems like the end of a long process.

But it may be only the beginning.

Numerous sources say that the Westport-based developer is under contract to buy both Sconset Square and 155 Post Road East. They’re contiguous properties: Sconset is the small shopping center off Myrtle Avenue with stores like Bungalow and Le Penguin restaurant, while 155 Post Road is the cement building across from Design Within Reach (the old post office). Eyeglasses.com is a current tenant; it used to house the Tack Room and Christian Science reading room.

155 Post Road East is a tired-looking building across from Design Within Reach (the old post office).

With Bedford Square, Waldman re-imagined the way we use Elm Street/Church Lane/Main Street. If he acquires those nearby properties — and, rumor has it, the Westport Pizzeria building too — he could redesign that section of downtown as well.

And tie it together with Bedford Square, which is much closer physically to Sconset Square than most of us now realize.

Sconset Square has been in Westport for years. Originally called Sherwood Square, it was the site of the original Sport Mart.

Word on the downtown street is that Waldman could reorient Sconset Square, opening up the backs of those stores to anyone using a redesigned walkway from the Post Road to Church Lane.

Removing the Westport Pizzeria building could create a pedestrian walkway to Church Lane — and enable merchants to utilize the backs of their stores, as well as the fronts.

He could also consolidate several of the parking lots on Church Lane — like the one behind SoNo Baking (soon to be Aux Delices) — making them more accessible and practical.

Right now there’s a hodgepodge of small parking areas off Church Lane, and behind Sconset Square. It’s tough to walk there from the Post Road.

Other rumors are flying, including the possibility of the Westport Arts Center and/or Westport Film Initiative moving into 155 Post Road East. That could give those organizations great visibility — and bring more people downtown.

The synergy between arts, retail, restaurants (and the new Bedford Square rental units) sounds exciting.

Of course, Bedford Square did not happen overnight.

It took many long nights of meetings.

Followed by 2 years of construction.

Westporters have so far voted with their feet. They’ve poured into Bedford Square.

There are sure to be many votes ahead for this next phase of downtown development.

Exit mobile version